Free songs
info@jbn.co.ug
+256 200901 224, +256 772 459 792, +256 702 458903,

230 MW Thermal Power Project at Itara, Hoima District

In 2012, JBN was contracted by Albatross Energy (U) Ltd to conduct the Environment and Social Impact Assessment (ESIA) for the proposed 230 MW Thermal Power Project at Kibingo in Hoima Municipality. JBN also presented the ESIA at the Public Hearing that enabled Albatross to acquire a generation license from the Electricity Regulatory Authority (ERA).